Index
Our team supported Plymouth Marjon University in developing a Campus Development Plan to help the University actualise its ambitions of achieving Net Zero by 2035. Our civil and structural engineers advised on Passivhaus retrofits, transport improvements to encourage active travel, and sustainable drainage to reduce flood risk and enhance biodiversity, alongside feasibility studies for new student accommodation through both retrofitted halls and new builds.
Client
Plymouth Marjon University
People focussed accessible space
We worked in direct collaboration with Urban Movement and Hackney Council to reimagine the vehicular dominant Amhurst Road as a vibrant and accessible local active travel corridor which promotes community wellbeing. Through extensive local engagement and co-design, the project proposes creating a safer, inviting public space that enhances civic identity, serving as a dynamic, people-focused environment for both residents and visitors.
Client
Hackney Council
On a unique stretch of the Lincolnshire coast, a landscape once managed as fairways and greens is being given back to nature. The National Trust’s Sandilands Nature Reserve transforms the former golf course near Sutton-on-Sea into a diverse mosaic of open water, islands, reedbeds, ponds, marshy grassland and dunes. It’s a place designed to provide refuge for wildlife, strengthen the ecological network along the coast and welcome people into nature throughout the year.
Client
National Trust
View Project
Rapid film studio expansion
Pinewood and Shepperton Studios have undertaken large expansion projects to increase studio capacity and production spaces. The two Studios opened their doors in the 1930s and are synonymous with the world-leading British film and television industry.
Client
Pinewood Group Limited
View Project
The factory was constructed in 1926 by the American giant Nabisco, who brought with them the latest developments in food production and factory construction.
The site is of major Engineering significance because of the new technologies that Nabisco brought to the UK and as an early example of the work of Peter Lind and Co. Peter Lind was a seminal constructor of major innovative reinforced concrete structures in the early to mid-20th century. His early works included Waterloo Bridge and the WW2 Mulberry harbours. It was his firm that built the Post Office Tower.
At the heart of the site was a complex of buildings which served the rest of the factory, comprising a boiler house, wheat unloading facility and wheat elevator to get the grain into huge storage silos. The silos are the first slip-formed concrete structures constructed in the UK. While the rest of the factory has now been demolished these buildings remain and are Grade II listed.
Client
RMS (Welwyn Garden City) Limited
View Project
Estate re-orientation and new visitor experience
The Estate Re-orientation will improve access to the site and provide new visitor facilities, incorporating a new visitor car park; roads; a new visitor welcome building housing a café; the refurbishment of a WWII building; plant centre; and a new playground.
Client
National Trust
credit to National Trust
View Projectcredit to National Trust
Our team are providing civil, structural, transport & movement for Plot C of the masterplan, which will provide 500,000sqft of commercial facilities over two buildings up to 23-storeys and will be the largest office building in Manchester once completed. There is also a large square which will provide high quality outdoor space within the masterplan. Plot C is the first plot to come forward in the overall masterplan. Our geoconsultancy team have developed a robust ground model across the geologically complex wider masterplan area; management of site investigation phases; and assistance with the enabling works for Plots A ,H and C. Our archaeology team prepared an initial Phase 1 Archaeological Assessment for the site and
Client
Bruntwood
credit to Allies and Morrison
credit to Allies and Morrison
We are providing civil and structural engineering and geoconsultancy services for the masterplan and the Phase 1 detailed design. Phase 1 includes the provision of 300 homes and 10,000 sqft of commercial space across three buildings up to five-storeys and public realm enhancements. The wider masterplan includes a further 750 homes. Our team researched the form of demolished buildings and developed a 3D Revit model of potential ground obstructions. Strategic and targeted intrusive site investigations were then carried out to validate these and inform a response to foundation design and allowances for ground works generally.
Client
Muse JV with English Cities Fund (ECF) and Wolverhampton City Council
359 homes in a heritage setting
A heritage impact assessment and archaeological desk-based assessment were produced by our archaeology team to inform the planning application for the part 28-storey, part 10-storey building designed to reference the City’s Victorian mills. The assessment considered the scale and height of the proposed building on designated and non-designated heritage assets and provided a visual impact assessment.
Our building services team developed the MEP design, including a complete PVC above ground drainage and rainwater system. An all-electric scheme with ASHP for hot water generation and a Whole House MVHR for background ventilation, using openable windows for purge ventilation and overheating.
Client
Central and Urban / JRL Construction Management Ltd
The reimagination of an underused grassed area into a biodiverse landscape that reduces flood risk, supports wildlife and creates new opportunities for people to connect with nature.
Client
London Borough of Lambeth
View Project
Our team supported Stonyhurst College with structural surveys, appraisals, and design proposals across its historic estate, including the Grade II listed Old Infirmary, assessed for potential conversion into sixth-form accommodation. Proposals included ground remediation, waterproofing upgrades, drainage design, and structural repairs. Additional commissions included condition surveys for the Teahouse and tennis court retaining wall, providing practical strategies to ensure safe, sustainable reuse of heritage buildings.
Client
Stonyhurst College
Reconnecting Stretford through people-first design
A major transformation project in Stretford, reconnecting local communities and enabling sustainable travel through a people-centred redesign of the Town Centre.
Client
Trafford Borough Council and Bruntwood
View Project